Infrastructure
World-class hardware for a certified Himalayan facility
An enterprise-grade AI cloud stack — NVIDIA HGX B300 on Supermicro hardware, delivered in technical partnership with an international GPU infrastructure operator, for deployment in a TIA-942 Rated 3 certified data centre in Kathmandu.
The technology stack
Every layer — from silicon to scheduler — is enterprise-grade and designed to be operated to international standards.
NVIDIA HGX B300
Blackwell-architecture GPU compute platform with ultra-high-speed NVLink interconnect and massive HBM3e memory — built for multi-billion parameter training and inference.
Supermicro
Server hardware and chassis platform, with SuperCloud Composer for infrastructure management and Server Manager for cluster operations.
TIA-942 Rated 3 facility
A TIA-942 Rated 3 certified data centre in Kathmandu, selected for Phase 1 colocation — the same class of facility that hosts global-scale tenants.
Engineering expertise
Delivered in technical partnership with an international GPU infrastructure operator that has designed and run NVIDIA clusters since 2018 — guiding compliant, optimized deployment.
NVIDIA AI Enterprise
Enterprise-grade AI software stack with NVIDIA Run:ai GPU orchestration for maximum utilization.
Kubernetes + Slurm
Container platform and HPC scheduling with PyTorch, TensorFlow, and JAX frameworks, monitored via NVIDIA DCGM, Prometheus, and Grafana.
The facility
CloudFARM's Phase 1 capacity will be hosted in a TIA-942 Rated 3 certified data centre in Kathmandu. Colocation terms are being finalised.
| Facility | A TIA-942 Rated 3 certified data centre in Kathmandu, Nepal |
|---|---|
| Certification | TIA-942 Rated 3 |
| Power source | 100% renewable hydropower from Nepal's national generation surplus at $0.07–0.08/kWh industrial rates |
| Grid resilience | Backed by the U.S. Millennium Challenge Corporation (MCC) Nepal Compact — a $500M+ program building 315 km of 400kV transmission lines and advanced substations |
| Connectivity | Tier-1 fiber transit via Indian telecom gateways to global networks — bandwidth is at quotation stage; no circuit is contracted yet |
| Cooling | The selected facility provides closed-loop advanced cooling architectures |
Security & compliance
Physical and logical controls designed for full adherence to U.S. export regulations and international data protection standards.
Biometric access
The selected facility provides 24/7 biometric access control at every entry point.
CCTV surveillance
The selected facility provides continuous video monitoring of all facility areas.
On-site security
The selected facility provides trained security personnel on-site around the clock.
Multi-layer security
The selected facility provides perimeter security, building access controls, and rack-level security.
KYC screening
Tenants are screened against the U.S. Consolidated Screening List before provisioning.
Network isolation
Strict VPC isolation and firewall rules are planned, with continuous monitoring and full audit trails.
Have infrastructure questions?
Our engineering team is happy to walk through architecture, compliance, and connectivity in detail.